Summary With No Feasible Solutions

Scroll Prev Top Next More

HOMER Logo

shots_navigating_results_icon


If your model produces no feasible solutions, then this is how the summary page would look like:

case3

 

If there are no feasible solutions, view some of the possible tips and considerations listed below.

Check the calculation report to get information on how many simulations were run, and why they were deemed infeasible

clip0002

Look through the model for constraints that might have filtered out the simulations as infeasible. Some of the reasons could be:

a. Load not served during outages due to insufficient power supply from other resources such as solar/battery/wind/generators
b. Penalties on emissions, as shown in Emissions below

 

emissions

 c. A high minimum renewable fraction in your Project Economics

constarints